EPIC Daily Operations Summary

Date of report(UTC): 2001/09/27 21:52
Author of report: Gus Emmanuel
Submitted at: 20010927:21:55
The C-130 flight scheduled for today was cancelled. The P-3 arrives from Tampa at about 4:00 pm local time.

MISSION PLANS:

PRIMARY MISSION:


SECONDARY MISSION:


TAKE OFF / LANDING TIMES:
 Plane Take-off Times(UTC) Landing Times(UTC)
NSF C-130    
NOAA P-3    

Pre-flight briefing times(UTC):
Update times(UTC):

AIRBORNE MISSION SCIENTIST NAMES:
NSF C-130 :
NOAA P-3 :


SHIP OPERATIONS:


OTHER SPECIAL OPERATIONS: