EPIC Daily Operations Summary

Date of report(UTC): 2001/09/10 19:16
Author of report: Gus Emmanuel
Submitted at: 20010910:19:30
There are no flights planned for today. Also, there is a "hard down" for both aircraft for Tuesday. The night-time flights originally planned for EPIC have been cancelled. All flights will be during daylight hours. It was tentatively agreed that if there are flights on Wednesday then, [a] the P-3 will do an ITCZ flight with BTs only; [b] the C-130 will do a short probe test. For Thursday, the P-3 will be down for a 50-hour inspection; the C-130 will do a flight along 95W with probes. Note: If there is no flight for the P-3 on Wednesday, then the 50-hour inspection will be done on this day with Thursday possibly being a flight day.

MISSION PLANS:

PRIMARY MISSION:


SECONDARY MISSION:


TAKE OFF / LANDING TIMES:
 Plane Take-off Times(UTC) Landing Times(UTC)
NSF C-130    
NOAA P-3    

Pre-flight briefing times(UTC):
Update times(UTC):

AIRBORNE MISSION SCIENTIST NAMES:
NSF C-130 :
NOAA P-3 :


SHIP OPERATIONS:
Ron Brown under way; New Horizon on schedule

OTHER SPECIAL OPERATIONS:
San Cristobal team launching 0000UTC radiosondes daily
No GTS transmission at this time