Aircraft |
1.
|
NSF C-130
(Remaining flight hrs: ~136)
|
Comment:
|
No missions planned for Monday
|
|
a.
|
Aerosol
|
Comment:
|
|
|
b.
|
Chemistry
|
Comment:
|
|
|
c.
|
Meteorology
|
Comment:
|
|
|
d.
|
Microphysics
|
Comment:
|
|
|
e.
|
Oceanography
|
Comment:
|
|
|
f.
|
Photography
|
Comment:
|
|
|
g.
|
Radiation
|
Comment:
|
|
|
2.
|
NOAA P-3
(Remaining flight hrs: ~81)
|
Comment:
|
No missions planned for Monday
|
|
a.
|
Meteorology
|
Comment:
|
|
|
b.
|
Microphysics
|
Comment:
|
|
|
c.
|
Oceanography
|
Comment:
|
|
|
d.
|
Photography
|
Comment:
|
|
|
e.
|
Radiation
|
Comment:
|
|
|
Ship(s) |
3.
|
Ron Brown
|
Comment:
|
will be transmitting reports soon- near Tropical Depression
|
|
a.
|
Aerosol Measurements
|
Comment:
|
|
|
b.
|
Meteorological Measurements
|
Comment:
|
|
|
c.
|
Oceanographic Measurements
|
Comment:
|
|
|
d.
|
Radiation Measurements
|
Comment:
|
|
|
4.
|
El Puma
|
Comment:
|
|
|
a.
|
Meteorological Measurements
|
Comment:
|
|
|
Surface Site(s) |
5.
|
Galapagos
|
Comment:
|
|
|
a.
|
Aerosondes
|
Comment:
|
Scheduled Operations begin mid Sept
|
|
b.
|
Soundings
|
Comment:
|
Daily 0000 UTC soundings- No transmission via GTS
|
|
c.
|
Operations center
|
Comment:
|
Intermittent connection to Quito server
|
|
Operations Center |
6.
|
Runway Status
|
Comment:
|
|
7.
|
Local Area Network
|
Comment:
|
|
|
Satellite Receiving Systems |
8.
|
GOES
|
Comment:
|
GOES data ingest OK
|
9.
|
NOAA POES
|
Comment:
|
OK
|
10.
|
SeaWIFS
|
Comment:
|
OK
|
|
Other |
Logistics
| Comment:
|
waiting for arrival of ocean probes
|