Next scheduled mission (ITCZ) is Sunday Sept 8
C-130 will "shadow" N43.
Galapagos Center has begun to submit reports and sounding products
= up; | = provisional; | = down ; | = no report |
Aircraft | |||||
1. | NSF C-130 (Remaining flight hrs: ~146) | Comment: | Scheduled take off 1430 UTC Sat Sept 9 | ||
a. | Aerosol | Comment: | |||
b. | Chemistry | Comment: | |||
c. | Meteorology | Comment: | |||
d. | Microphysics | Comment: | |||
e. | Oceanography | Comment: | |||
f. | Photography | Comment: | |||
g. | Radiation | Comment: | |||
2. | NOAA P-3 (Remaining flight hrs: ~89) | Comment: | Scheduled take-off 1430 UTC Sat Sept 9 | ||
a. | Meteorology | Comment: | |||
b. | Microphysics | Comment: | |||
c. | Oceanography | Comment: | |||
d. | Photography | Comment: | |||
e. | Radiation | Comment: | |||
Ship(s) | |||||
3. | Ron Brown | Comment: | Sailing on schedule | ||
a. | Aerosol Measurements | Comment: | |||
b. | Meteorological Measurements | Comment: | |||
c. | Oceanographic Measurements | Comment: | |||
d. | Radiation Measurements | Comment: | |||
4. | El Puma | Comment: | |||
a. | Meteorological Measurements | Comment: | |||
Surface Site(s) | |||||
5. | Galapagos | Comment: | transmitting reports to field catalog | ||
a. | Aerosondes | Comment: | Scheduled Operations begin mid Sept | ||
b. | Soundings | Comment: | Daily 0000 UTC soundings- No transmission via GTS | ||
c. | Operations center | Comment: | OK | ||
Operations Center | |||||
6. | Runway Status | Comment: | |||
7. | Local Area Network | Comment: | |||
Satellite Receiving Systems | |||||
8. | GOES | Comment: | GOES data ingest OK | ||
9. | NOAA POES | Comment: | OK | ||
10. | SeaWIFS | Comment: | OK | ||
Other | |||||
Logistics | Comment: | VAT taxes paid, expect release of sondes and ocean probes soon. |