EPIC Daily Operations Summary
Date of report(UTC):
2001/09/03 18:40
Author of report:
José Meitín
Submitted at:
20010907:18:45
Monday Mission #1
ITCZ mission
MISSION PLANS:
- PRIMARY MISSION:
-
ITCZ mission with N43 in the "lawnmower" pattern at 6000ft and the C-130 doing N-S transects at various altitudes
- SECONDARY MISSION:
-
TAKE OFF / LANDING TIMES:
-
Plane |
Take-off Times(UTC) |
Landing Times(UTC) |
NSF C-130 |
1430
|
2330
|
NOAA P-3 |
1500
|
2300
|
Pre-flight briefing times(UTC):
- Update times(UTC):
AIRBORNE MISSION SCIENTIST NAMES:
-
NSF C-130 :
Baumgardner
-
NOAA P-3 :
Raymond
-
SHIP OPERATIONS:
-
ROn Brown in port, San Diego Calif.
- OTHER SPECIAL OPERATIONS:
-