EPIC Daily Operations Summary
Date of report(UTC):
2001/09/03 16:23
Author of report:
Gus Emmanuel
Submitted at:
20010909:16:40
Both aircraft fly a 95W ITCZ mission today.
MISSION PLANS:
- PRIMARY MISSION:
-
95 West mission for both aircraft
- SECONDARY MISSION:
-
TAKE OFF / LANDING TIMES:
-
Plane |
Take-off Times(UTC) |
Landing Times(UTC) |
NSF C-130 |
9AM Local
|
6 PM Local
|
NOAA P-3 |
9 AM
|
5:30 PM
|
Pre-flight briefing times(UTC):
- Update times(UTC):
AIRBORNE MISSION SCIENTIST NAMES:
-
NSF C-130 :
Darrel Baumgardner
-
NOAA P-3 :
Dave Raymond
-
SHIP OPERATIONS:
-
Ron Brown in San Diego; New Horizon on schedule
- OTHER SPECIAL OPERATIONS:
-
San Cristobal team launching 0000UTC radiosondes daily
No GTS transmission at this time