EPIC Daily Operations Summary

Date of report(UTC): 2001/09/03 16:23
Author of report: Gus Emmanuel
Submitted at: 20010909:16:40
Both aircraft fly a 95W ITCZ mission today.

MISSION PLANS:

PRIMARY MISSION:
95 West mission for both aircraft

SECONDARY MISSION:


TAKE OFF / LANDING TIMES:
 Plane Take-off Times(UTC) Landing Times(UTC)
NSF C-130   9AM Local   6 PM Local
NOAA P-3   9 AM   5:30 PM

Pre-flight briefing times(UTC):
Update times(UTC):

AIRBORNE MISSION SCIENTIST NAMES:
NSF C-130 : Darrel Baumgardner
NOAA P-3 : Dave Raymond


SHIP OPERATIONS:
Ron Brown in San Diego; New Horizon on schedule

OTHER SPECIAL OPERATIONS:
San Cristobal team launching 0000UTC radiosondes daily
No GTS transmission at this time